Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 9164

Re: Relationship between Quality Info Record and Delivery Schedule

$
0
0

Hello Andrea,

 

If you go to Control key Config, and check GR control/Batch field you can set two Controls in standard; 1.  Do not Create New Inspection Lot  2. Create New Inspection lot.

 

Your requirement does not fit into this.

 

I would suggest to implement enhancement QAAT0002. Same has been suggested in Documentation (F1) for GR control/Batch field.

 

First Batch in Source Inspection Lot: GR Control

Use

 

Your entry in this listbox controls the creation of a new inspection lot at
goods receipt of a batch material, if the batch in the goods receipt document is
different from the batch given in the source inspection lot.
If there is an entry for the vendor batch field and the batch field in the goods receipt
document, the system also checks whether the vendor batch is contained in the
source inspection lot and if it is consistent.

 

If you decide to create an inspection lot, this occurs under the following
preconditions:

  • No batch was entered in the source inspection lot.
  • A batch was entered in the source inspection lot that differs from the batch
    that was entered in the goods receipt document.
  • The vendor batch is contained in the source inspection lot, but it differs
    from the vendor batch in the goods receipt document.

 

If you want to use a different control from the standard, you can implement
the enhancement QAAT0002.

 

 

Amol.


Viewing all articles
Browse latest Browse all 9164

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>