Dear All,
I am facing problem in preparing functional specification for a Z report.The requirement details are given below
MC46 gives me a list of all items that have not got consumed since the last period (defined in terms of 'no of days' on the screen before executing the report) This report give a list of items that have shown nil consumption in the defined period. This list helps us analyze and categorize these items as Slow-moving or Non-Moving items. The output is in terms of Part no and Part Description.
Example; Suppose we are executing the transaction on say 29.10.2013.The system ,say give list of materials X1,X2 and X3 with nil consumption in the defined. The transactions suppose is again executed
on 29.10.2011.The report say again give a list of materials X1 and X3 with nil consumption. The material
X2 is excluded from the report as it might have been consumed in certain business processes(either issued to cost center or issued to production).
The client wants a report from where it is possible to determine a list of materials along with consumption
and the date on which the material have moved out of stock for consumption. In otherworldu2019s we can say the report should give :
stock on starting date(say 29.10.2013)
Consumption/movement in terms of date and quantity
The problem is that when the transaction MC46 is run the next time(say on 29.11.2013 or any day after
29.10.2013) there might be materials which might have got consumed in the interim period and therefore have got excluded from the latest list. We need to have a look at these interim materials to analyze their movement/consumption.MC 46 Report does not give details of openinf stock, closing stock and the purpose for which the stock have moved out of stock
The client wants a Z-Report which will give details about the material which have moved out of stock when the report will be executed ,opening stock,closing stock.The detail requirement are given below
The report will assist the client to get a list of all such items with reference to a starting date and their movement in the period (period from the starting date to the run date)
Selection Screen(Input)
Opening Date
Closing date
Movement type
Plant
Output
Material nos(Material which have moved out of stock when the program was last executed)
Movement type
Movement date
opening stock qty
opening stock value
closing stock qty
closing stock value
I request if any one can help in preparing functional specifications.