I tried this on 10.1 and was able to pull up a control. try creating a new control, assign it to the sub process and organization with dates expiring 12.31.9999, make sure the control is only assigned to one specific business rule.
↧
I tried this on 10.1 and was able to pull up a control. try creating a new control, assign it to the sub process and organization with dates expiring 12.31.9999, make sure the control is only assigned to one specific business rule.