Re: Rescheduling horizon at 999

$
0
0

Hi,

 

What do you mean by "it should have pulled it in"? Are you expecting the PO lying outside the 999 day horizon to be brought inside it by MRP?

Marianne Zoricak wrote:

 

Hello, we set our rescheduling horizon at 999 days for the correct MRP group in configuration, however when we run MD04, the date of 12/24/2018 did not reschedule. It should have pulled it in. We put the date of 12/24/2018 as a test to see if it would pull it in to within the 999 days, but it did not.

 

If yes, then that's not the intended functionality. The functionality is intended to check if any firmed proposals that exist in future can cover new requirements by rescheduling the proposal. If true, the system will propose rescheduling. The original proposal should however be within the rescheduling horizon.

 

In your case, the PO could very well be outside the 999 horizon as pointed by Caetano. Besides, you have a situation of surplus. Both your customer orders are already covered by the stock and planned order and MRP has proposed cancelling your PO.