Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 9164

Re: QM Control Chart and Hazardous Material Management

$
0
0

Hi,

 

I can see several inspection lot in the top list, but I can't see several points in the bottom graphic.

And I choose "030 Task list charac./inspection lot" in inspection plan SPC criterion.

That's why I only got one point in the control chart?

 

Thanks.


Viewing all articles
Browse latest Browse all 9164

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>