Hi, Rajneesh,
first, thanx , i found the people like you here are really kind and provide answers instantly.
to your answers
1. i checked cs03, no BOM under the material i tried to give cost.
i checked CA03 with the plant , and date as 30.10.2014 ( also todays date and yesterday), got the following warning
Does that mean , no routing ?
2. if there is no routing, then where the 119000 comes from , to your question, I want the price be updated as 200, that is my target
3.. about the transaction i called, let me tell what i see
3.1 MR21 , i create a cost, thus the price would pop up in the material " standard price " .
3.2 CK11n, after calling this, the cost would be given a period and pop up in the " Future " .
3.3. CK24, after calling this, the cost will be released from the "future " ----> " current "
I thought there would be sth wrong with the current price, thus i asked how to delete the price. So I called CKR1 and delete the current price, ( indeed it does delete the cost), but I still can not create a new cost ( 200 ) for the material,, because 119000 still comes , after i call CK11n.
and if i dont call CK11n, direct call CK24 after MR21, then i got #
so my target is to update the cost to 200
thanks:)