Reg: Individual/collective requirement indicator in MRP-4

$
0
0

Dear Experts ,,

 

I have the following BOM structure,

 

SDN.png

 

 

 

 

 

 

We are working on MTO scenario (Strategy group :25)

 

For all Ram Materials(RM 1 , RM 2 , RM 3 , RM 4,RM 5) i have maintained individual/collective requirement -2.

 

I have a requirement where existing stock should be consumed and if stock doesn't exists system should create purchase requisition.

 

I tested by maintaining individual/collective requirement in MRP-4 as 2  for raw materials , system is considering the existing stock and if

 

stock doesn't exists system is not creating purchase requisition instead only showing dependent requirement in MD04 during MRP run with MD50.

 

Could anyone guide me on this.

 