Hi Arun,
This issue is very specific to the calendar selected.
1) Check whether validity of factory calendar is set to 31.12.9999
2) Check thoroughly on each & every task the calendar selected.
If both the above are ok, then tell us the scheduling scenario used in project type and share the screen shot of all phase dates.