Hie Guys,
Just had a general question. Is scheduling a report same as refreshing a report ? Say if the data is loaded every Tuesday and I schedule to run the report every Wednesday, then does that mean the report will be refreshed with updated data every Wednesday? Also, what is the difference between scheduling a report vs. having "refresh on open" option checked.