Hi
We have tried to transfer the availability information from SAP HCM to MRS system using the report "/MRSS/HCM_RPTWFMIF".
We cannot able to read or transfer the same. Can anyone let me know the list of configuration need to be done apart from below.
- Configure Basic settings-HR resources has been selected.
- Time allocation type-I have configured few time allocation type and enabled EI integration check for two TA types
- Assign the allocation type to the resource type
- HR integration -here I have assigned the TA type the various info types 2001,2002,2003 & 2004.
I have also assigned the TA type to the PWS info type with Sub-info type as "*" without any TA break and TA work assigned to it.
I request you please let me know, if I have missed any other configuration to be done regarding the above requirement.
with regards,
V.Vijay Kumar