Hi Miriam,
Check table MAPL and see if the material is assigned to the inspection plan and valid date is after the GR date.
Check your system with KBA
2112741 - Inspection plan is not selected when inspection lot is created;
Inspection lot status is CRTD
Regards,
Nancy